Chemical Case Study
BASF Wyandotte, MI Chemical Case Study
- Project Details:
- W.J. O’Neil completed one of the largest process piping jobs in recent Michigan history. The project required 170,000 linear feet of stainless steel and carbon steel piping. Other areas worked: SGO area including hot oils and peroxide building, emulsions production and resin cutting (EP & RC), product tank farm including truck unloading and drum filling, monomer tank farm including rail and truck unloading, utility building and outside area.
- Customer:
- BASF
- Project Cost:
- $75,000,000
- WJO Role:
- Prime Mechanical Contractor