GM - Delta

The design assistance of our 3D CAD system on the job site was the key to enabling us to complete this six-month project on time and in budget.

As the mechanical contractor for the central utility complex for the Delta Township plant, we installed and piped chillers, boilers, and air compressors. The plumbing was fabricated in our Livonia fab shop and shipped to the job site for installation.

Industry: Automotive

Scope: $5 Million

LIVONIA, MI (Corporate Headquarters)
35457 Industrial Dr.
Livonia, Michigan 48150
734.458.2300
734.458.2305 Fax

24-hour emergency service